This Old House: Trade School: Getting the Lead Out

USWPIX, 14.10.2017, 10:30

Plants are temporarily transplanted 3-D printed architectural models the front entry porch and accessibility ramp are removed lead paint is removed excavation begins for the new addition drain and sump pump systems are set up.



Download und Stream

Kostenloser Download
Gratis Stream